Phase II is the design, bidding, and construction of a combination of gravity sewers and low-pressure sewers to service the Meetinghouse Pond area. The figure below shows the layout of the collection system and pumping station.
At the Special Town Meeting on October 16th, 2023 the Town voted to expand the Meetinghouse Pond Sewer Collection System Area to include Tides End Lane and Hayward Lane to add approximately 4,000 linear feet of low pressure sewer.